Model railroaders Ray Arnot, Don Iris, and guest Drew James discuss the Canada Spokane & Pacific Railroad operations, the appeal of NER conventions, and the importance of starting operating sessions early in layout building. The conversation offers insights into layout development and community events for hobbyists.
3 cylinders, Mountain Class power, unmistakably New Haven. Broadway Limited Imports proudly presents the all-new HO scale brass hybrid New Haven R3A Mountain. Handcrafted brass detail meets the weight and performance of diecast construction. Available with Paragon 4 sound and synchronized smoke, or in Stealth Series DCC ready. Bring one of New Haven's most distinctive steam locomotives to your railroad. Available now through your favorite BLI dealer. Your scenery tells part of the story. Scale Signs fills in the details with thousands of realistic railroad, street traffic, and business signs, plus custom artwork.
Scale Signs brings every scene to life. Find the signs that your layout has been missing at scalesigns.com. Scale Signs, because the smallest details can make the biggest difference.
Real railroads don't come in standard track plan pieces. Why should yours? With Roadmaster Flexible Turnouts from Oak Hill Model Railroad Track Supply, you can curve a turnout to fit the place you're modeling. The laser-cut tie base and precision tie plates guide construction, then remain part of the finished track. See what you can build at OHRTrackSupply.com, where track is a model too.
Prototype modeling comes alive at the 2026 Colorado Rail Proto Meet in Greeley.
See inspiring models, learn new techniques, and connect with fellow modelers. Learn more at corpm.org. More stories from the people who make this hobby great. Sign up for our free newsletter at atlpxtra.com.
ATL P Rewind. Hello everybody and welcome to Around the Layout, where model railroaders come to tell their story. My name is Ray Arnot, so glad you could join us. It's time once again for Talking Ops with Don Iris, and joining me live in the studio, Don Iris.
Don Irace
Hey, Ray, glad to be here. It's nice to see the studio for a change.
Ray Arnott
Yeah, yeah, it's definitely neat. It's been a learning experience a bit. We've only had a couple that have actually recorded here live in the studio, so we had to make a couple changes because we've got an awesome guest with us tonight. That would be the owner of the Canada Spokane and Pacific Railroad. That's Drew James. Drew, welcome to the show.
Drew James
Hey guys, excited to be here.
Don Irace
Drew, glad to see you here.
Ray Arnott
Again, we got all the technology working. We can all see each other. Somehow I've been able to plug in the right wires and make the right connections and wrap the right electrical tape around things that need to be connected. So glad we're able to get together. It's been a while since we've had you on the podcast and we got to learn about how you developed the layout for the Canada Spokane and Pacific Railroad.
But then you, at the end, we disconnected, we ended the show and you went, I didn't get to talk about ops. So here we are. It took us a full year to get around to this, and I hinted to you that something was coming, and then you probably at some point maybe even think that it wasn't coming at all.
But we're here and we're gonna get everybody brought up to speed on how you develop the operations. And both the guys sitting here in the studio here have been able to operate that layout, and it's an absolutely fantastic one. So Really excited to get to talk about it. But first, you just got done wrapping up your attendance at the NER convention. Why don't you tell us a little bit about your trip out to Rochester?
Drew James
Yeah, the NER convention was in Rochester for the first time because the Lakeshores Division used to be in a different region. And a few years back, they moved into the NER. So this was their first convention and they really did a fantastic job. It was a, it was a great convention. It was very well attended. And the venue could not have been better at the RIT Conference Center. We had plenty of room and great food and the rooms were good.
And of course there was, as Bill Brown said at the awards breakfast, he said, you know, it's a great convention when you just have too many things to choose from.
Ray Arnott
Yeah.
Drew James
So, you know, you wanted to go to clinics, you wanted to look at layouts, you wanted to operate, you wanted to go on, train excursions, and there was just too many things to choose from. But I really enjoyed myself, and I— and everybody else seemed to be having a good time. I was able to host an op session on Thursday late afternoon into the evening for folks who were driving out to Rochester and were passing through Syracuse from the east.
So that was a lot of fun. We had a— we had a good time at that session.
Don Irace
Good. I'm sorry I missed it.
Drew James
Yeah, we missed you guys. So hopefully, uh, we'll see you in, uh, Concord next year.
Don Irace
I'll be there. We'll be in Concord. I'll see you. Well, see you probably after you drop before that.
Drew James
Definitely.
Don Irace
Back up for that.
Ray Arnott
Yeah, it's, uh, unfortunately that NER convention for me falls right around the time I host a roller hockey tournament. And although the rink, if anybody else heard, you know, me personally talk about this rink project, it's been pretty crazy, but It always seems to fall right on that same weekend. So hopefully we can shake it up. Maybe I just got to move the roller hockey tournament and just say, you know what, I got other things going on, guys.
We're going to hold it on a different day.
Don Irace
So different.
Ray Arnott
Yeah, we'll figure it out.
Drew James
You know, I'll tell you that I think that the regional conventions are just such a great bang for the buck. I love them. You know, I went out to Long Beach this year, mostly to work at the convention. I didn't get to participate too much, but I'll tell you, I love the, uh, I love the NER conventions. It's the right length of time. There's always great layouts and, uh, great people, and it's always a lot of fun.
Don Irace
Yeah, the NER conventions. I mean, we've been going to NER conventions for 14 years. I have anyway. And every one of them has just been as good as the next, good as the next. Never, ever, ever had a bad time at an NER convention. Not once. My kudos to all those guys that set all that stuff up. I mean, and I've been everywhere.
We've had them, we've had them in Rhode Island, we've had them in Mass, we've had them up in New York, we've They've been all over the place and we've never ever had one that we could say, well, that wasn't that good. They're all good.
Drew James
I only started going about 5 or 6 years ago when I retired and I can't believe what I missed.
Ray Arnott
Well, I'll tell you what, for, you know, you mentioned retiring, for somebody who's, you know, in the workforce still employed, that short format is a lot easier to digest too when it's only, you know, 2, 3 days. That makes it a lot easier not to be burning up all your vacation time. I mean, my vacation time really should be designed to be taking the kids and the wife somewhere. So it allows, you know, if I can take a day off or a day or two, that's a lot easier to make happen.
Plus the affordability and everything else. And then the NEARC region itself, I mean, just phenomenal. I'm really proud to be a part of it. And Don's still a part of it.
Drew James
I am.
Ray Arnott
Yeah, just a lot of great things happening.
Don Irace
I mean, it's like I can say, it's— I mean, they're perfect. There's always plenty to do. There's great layouts. There's always good clinics. And it's just— every one of them has always been perfect and put on properly, you know? And like I said, the length of time is always good. And I've enjoyed them all. I hope they just keep it going.
Drew James
If you just take Friday off, you can participate in 95% of it.
Don Irace
Yeah, I gotta, I gotta, we gotta start on Thursday. That's just the way it is. Yeah.
Ray Arnott
So, you know, but for the working guy, that's great. You know, 3, you know, you can get 2 or 3 days in and that, that works out very well for a convention. And, you know, action-packed, really jammed with some really good activities. And like Don said, awesome layouts in the region to really, uh, make it great. Which kind of leads me to, you know, they talk about the area in the Central New York Division, which is part of the NER.
And, and the event that you guys host, the Ops to You Drop event in, in the April, uh, time frame, is just another really well-run event that we, we look to. And Don's been doing it for how long? You've been doing these, uh, any of the— I'm sorry, the Ops to You Drop?
Don Irace
I've been doing Ops to You Drop for at least— time goes by so fast— 5 or 6 years anyway I've been doing it. And I mean, and I moved to Florida and I still come up To go to the Opsia Drop, I just look forward to it every year. It's it's definitely worth the trip. You know, I'm not looking for any trophies for being the father traveled. I just want to operate the layouts up there.
Drew James
Well, Bill Brown does a great job of organizing that event every year. It's always one of my favorite weekends of the year, and this year I believe we're gonna have a couple of new layouts, so that'll be good. Nice. I know that. Ed O'Rourke, who is the president of the NER, he started building a new layout about a year ago. He moved into a new house. And so his layout should be hosting op sessions.
So, you know, there's gonna be, there should be some new opportunities.
And as a matter of fact, one of your guests, because I learned about him through your show, Bruce Ryan, he, I believe, is gonna participate as well in the weekend. So. So it should be, uh, it should be a good time as always. And Don, if you've been coming that long, you, you probably operated on the CS&P when it had 3 feet of scenery.
Don Irace
Um, I, I think I've operated on your layout the last 3 times I was up there, you know. It was— I don't remember you not having any scenery. It must have been— maybe, maybe it hasn't been that long. I don't know.
Drew James
When you retire, time just travels and you just I guess that would have been, that would have been 2017 was the first time I opened up this layout for Ops Till You Drop. And, and, uh, we worked really hard to get some scenery on it, and there was actually 3 feet of scenery was all there was. Everything else was bare, bare bench work, but, but all the track was in and running.
There was cardboard boxes for industries, but we were operating.
Don Irace
Yeah, that's right. There's nothing wrong with that. I've seen, I've seen plenty of layouts like that. We operate out of a cardboard— Soudro Brown up in Amherst there, he never had a stitch of scenery. You know, all he had is cardboard cutouts for buildings and everything, but he had a big crew and operated trains, a lot of them too.
Drew James
You know, one of the pieces of advice I always give to my friends as they're starting to build new layouts is I think it's important to— if you plan to operate, I think it's important to start operating earlier rather than later, in particular before you're totally covered in scenery. I know that, you know, I started doing that in the CS&P and it really paid off dividends because sure enough, you know, I learned that the yard throat wasn't correctly designed and needed to be ripped up and, and, and put down again.
And there was track work that wasn't good and had to be fixed, and there was new industries to be added, and there was an awful lot of— I'm not going to say a dramatic amount, but certainly a non-trivial amount of changes that I made to the layout from the time we first started to operate to the time that scenery was well underway. And it was a lot easier to make those changes when I wasn't ripping up scenery and plaster and ballast and all that.
Don Irace
Right. Absolutely. I mean, people— I talked to people about building new layouts and they talk about scenery. I'm like, if you're going to operate, Get a crew of guys over here, operate it, prove the track, make sure it's what you want. You know, your tracks, your switches are where they're supposed to be, everything is working, and just run it. I mean, when I did my first layout, I operated for like 6 months before I started doing any scenery, and I didn't do it until everything was done.
Every— everything was happy, everybody was happy, there was no problems, and then the scenery stuff come out. And, and even this layout, the same thing.
I operated this layout for 6, 7 months with the same crew of guys until we proved it. And it was what we wanted to do, and, and then I put all the scenery on it. That's it, no more changes.
Drew James
And, uh, you know, on the CS&P, one of the design aspects is that there's long single-track runs between towns. So we started the scenery building really on those long, you know, single-track runs between towns where there was less apt to be any changes, right? So once the track was proven to be, you know, reliable, then we started scenery there and, and then progressed into the, into the towns as they finally, you know, stopped, stopped changing the track configuration.
Don Irace
That's a good idea, because if you want to lace— if you want to get some color on your layout, like I said, those are the best places to start where, you know, you got a straight track, it's going from one point to another, you don't have to worry about pulling stuff up and changing stuff, and, and you make the best of both worlds. You get some scenery down, some color in the layout, and you move on from there.
Drew James
Absolutely.
Ray Arnott
Yeah, it's definitely good. You know, the best track plan in the world still can be shaken out by some implementation and, you know, running stuff on it and checking it out, for sure.
Don Irace
Yep.
Ray Arnott
For those that haven't checked it out, we'll put a link for the, the original show that we did. That'll be aroundthelayout.com/50. But for those that haven't heard it yet, why don't you just give us a quick summary of your railroad?
Drew James
Okay, the, uh, Canada Spokane and Pacific is, uh, proto-freelanced railroad. It's June of 1978. It's jointly owned by Burlington Northern and Canadian Pacific. It's between Calgary and Spokane. It's a north-south oriented line. The layout itself, it's a fairly good-sized layout. It takes up about 1,500 square feet of my basement. There are 5 towns on the railroad with a long single track between them.
It's got a double-ended staging yard that represents both Calgary and Spokane depending on which direction you come into that yard or you're leaving that yard. It has one major yard in Nelson, and that yard is— its primary purpose is to service the other towns with locals to build the to build the locals that go out and service those towns. And it was definitely designed and built for operations. I had a layout in a previous house that was very similar in style.
It was just about a third the size. So I did get to proof out a lot of concepts and kind of evolve my philosophy of, of what I wanted to do operations-wise on, on this layout.
Ray Arnott
So you had this layout that was, I think you mentioned, a third of the size of this one. What were some of the things that when you started to put the plan together for this new one, like the must-haves from that you didn't have on the smaller layout?
Drew James
The main thing was I wanted to have long mainline runs. So I wanted crews to have a feel for traveling somewhere between towns. I did not want the engine entering one town as the caboose was leaving the previous town. And also it was designed so that it's generally, you cannot see the next town that you're gonna be traveling to. So that also gives it a distant, you know, a feel of having traveled a distance.
So those were, you know, those were the primary goals that I had. I wanted a single-track mainline. I knew at some point I wanted a CTC machine.
So, you know, that was a goal as well.
Don Irace
Tell us about the CTC machine because I've seen that CTC machine. That thing is unbelievable.
Drew James
Well, let me talk to you a little bit about traffic control then and what we do on the layout. And it is CTC and I don't have a lot of experience with timetable and train order. I've operated a little bit using kind of, I'll say, very timetable and train order light, not really the full method. And I've also operated with track warrants on a layout or two. And I kind of reached the conclusion the CTC made the most sense.
And the reason is several things. One is It's easy for guests to understand. So I knew that on the CSMP, I would be hosting, I hope to host, and it's worked out that way, a lot of guests coming in from out of town to participate in op sessions.
It can be tough to try to teach them timetable and train order, but CTC is fairly straightforward. You can teach them the basics. You know, what's the saying? If it isn't all red, there's no red, right? So you can quickly quickly get them to understand how to follow the signals. And the other aspect of it is that I think most model railroads, our traffic density is way higher than the prototype.
Ray Arnott
Right.
Drew James
So I'm modeling this single-track secondary route up in the Pacific Northwest, and I run 21 trains a day. So that's unrealistic. That's way more traffic than you would expect. But because our main lines are all too short, even on a layout the size of mine or your old one, Don, you have a lot of traffic density. And CTC is the easiest way to get through all that, to run all those trains without— When I've run using track warrants, for example, I was spending so much time doing paperwork, I couldn't get the train over the road, if you will.
So I kind of settled on CTC as being what made the most sense. And then as I mentioned in the last episode, I saw some CTC machines. Kevin Udally has an amazing one on his C&O layout.
I saw that in 2018. There's a gentleman by the name of Doug Geiger who does clinics at National on CTC, and he actually has a refurbished machine, which I got to see out in Colorado actually a year ago. And, you know, then the one at the Colorado Model Railroad Museum. So I saw some CTC machines. I never really knew how they worked, but I was like, I gotta have one. And so, so Ken Cameron, Dave Martini, and myself, we, you know, during the pandemic, we decided it was time to build it.
And we had, We had implemented it, or Ken, I'll say, had implemented it on JMRI. So we had a virtual machine that we ran for several years and it was changing all the time.
And then once it finally settled down and we went almost a year without changing the virtual machine anymore, we decided it was time we could, you know, implement it in hardware. So that's how that machine came about. And I love it. I've actually never dispatched using it, believe it or not.
Don Irace
That's funny.
Drew James
But I have more and more, we actually, you know, give certificates to our certified dispatchers. And I think I have, let me see, 4, I think 4 now, including a 15-year-old.
Don Irace
That's nice.
Drew James
What's wrong with that? Yeah.
Don Irace
Yeah.
Drew James
He is one of my best dispatchers.
Don Irace
Nothing wrong with that at all. Get 'em young.
Drew James
Yep.
Don Irace
Getting back to the timetable stuff, I'm like, I agree with you. I've operated on plenty of layouts that have timetable operation, and I gotta say that with people that never done it and you've got a bunch of them in the room, the timetable never works out. By the end of the night, the railroad's a total mess and nothing's where it's supposed to be. But anytime I've operated on a CTC-type system, everything is going as planned.
And I agree, to try to teach people have never operated timetables in one night or the first 20 minutes when you're giving your speech in the beginning of the op session, it's very hard to pick up because especially if you got a— what is it? The clock, the fast clock. They throw that in there and now everybody sees the clock where you're supposed to leave at this time and you don't leave or you leave too late and now you got to be somewhere and you look at it, well, I got to be there in like 5 minutes.
And in your head, what 5 minutes is compared to what the time clock is counting down. It's tough to get there and then everything just went away.
It's like, forget it.
Ray Arnott
It's kind of like I've talked about it before with levels of operating. You got beginner, intermediate, and advanced. And the timetable train order seems to be on that advanced level, right? Yeah. It's not something you want to have the first operating experience with. You want to really be on a CTC or maybe even something without control or very simplified. to be able to start to learn the theory of operations, then work your way towards those kinds of things.
Don Irace
Train orders. The train order part's good because, I mean, dispatch is giving a train order on a warrant, right? There's really not a lot of pressure in there for the operator. You're going to, you're going to listen to dispatch, you're going to copy down what he says onto your order, and you're going to go do your work. There's nobody, there's no clocks, there's none of this stuff. You know, there's no time. You start putting times in there and that just makes everybody go crazy.
You know, like, oh, I got to be here now.
Drew James
I got to be—
Don Irace
I didn't, I didn't sign enough of this, you know what I mean? So, um, but yeah, I, I totally agree that, um, my layouts would have never made it with timetable operations. And I did think about it in the beginning, but I quickly changed my mind to CTC.
Drew James
So interestingly, at, um, at the NER convention, Steve King gave a, gave a 2-hour clinic, and, and he's one of the experts in this area. He's written, you know, several, lots of articles and books. And so I was in that clinic along with a couple of my regular operators, and we had a lot of discussion about it afterwards because I actually would like to get to where I do run some— an occasional timetable and train order session with a handful of my regulars.
If I can get a group of guys who really want to learn it, you know, with— I would run a lot fewer trains. And, you know, we would— we think that would be a fun thing to do on occasion. But I'm definitely, you know, a ways from getting there yet. But it is one of those things that's on my to-do list, you know, out in the future. If we're ever starting to get bored with the current operations or whatever, we'll try to implement some timetable and train order.
Don Irace
Yeah, I mean, I agree because if you have a crew that you normally have at your layout week after week or month after month, And those guys get used to doing timetable operations, things will go much smoother because they understand it. And then the more they do it, the more they understand it and the better it gets. But like I said, you bring a group of new guys in to try to do that, you're never going to pull it off.
I've never seen it pulled off in all the layouts I operated like that.
Drew James
Another area that I learned a lot from my old layout was in the car forwarding area. So we use switch lists on the CS&P, but that, although I guess it's always been the case on this version of the CS&P, on my previous version, I actually started out with car cards and waybills. And there was a lot of things that I liked about the car cards and waybills. The main thing I liked about 'em was that you really had this feel that the cars were moving in rational ways, that they were, there was a rational reason why this car is in that industry.
But the problem was is that the operators didn't seem to really notice that or care too much about it. They just wanted to know, where does this car need to go? And so what— and also, some of my operators definitely would fumble around with the car cards and, you know, they would get dropped or, you know, just to try to—
Don Irace
Taken home.
Drew James
Yeah, taken home. I definitely had people call me up.
Ray Arnott
They're not souvenirs.
Don Irace
No, you're gonna fix that. About 3 days later, You get an envelope in the mail with your car cards in it.
Drew James
Yeah, I had people next time I saw 'em and say, hey, I found 2 car cards in my pocket. And so what I started to do on that layout was I actually still used the car cards and waybills that were out on the layout, but I didn't have my crews handle them at all. I just made switch lists prior to the operating session based on those car cards and waybills.
And then I gave the crews a switch list. On the new CS&P, I never went down that path because I thought it was gonna be too much work. And so I just started with switch lists from the get-go, which is, I prefer, and also, you know, my crews prefer the switch lists as well. As they'll tell me, they'll say, look, when they're out there on the prototype moving cars around, they don't care where it came from or where it's going.
They just wanna know what am I supposed to do with this car?
Don Irace
Mm-hmm.
Drew James
where does it go? So I've been using switch lists and I keep revising them. And what I have, I actually have played around a little bit with some of the software programs. I've played around with JMRI Ops and I've played around with, what's it called, ShipIt.
Don Irace
Right.
Drew James
Several years ago. And where I ended up, it's It's not ideal, but it works for me. What is it? Well, I have a— I just have a big spreadsheet of every single car that I have in service. So there's about 300 and something cars, 350 cars. And every car, I have a 6-day op session, 6-day sequence, if you will. And this big spreadsheet tells me where every car goes Every, for those 6 cycles.
And then the 6th cycle, the car ends up back again where it needed to be for the first cycle. So, and then I print out my switch list from that huge spreadsheet.
And so far, I don't think, I think the 6 days is enough so the operators aren't noticing the same car going to the same place because it only happens 6 op sessions later, which is, you know, probably 5 or 6 months later.
Don Irace
Right.
Drew James
Yep. And it does give me a lot of control, which is what I like compared to the software I was using, trying to use. It gives me a lot of control of what cars are gonna be on what trains and making sure that there's not gonna be, you know, too many cars trying to get into a siding, you know, into a spur, an industry spur. So that's kind of where I've landed. But it was a bear to set up.
And when I— let me see, I just got a new car in the mail today, and just to add a new car into the spreadsheet, it takes me a good 20 or 30 minutes just to update all the switch lists and everything that needs to be updated when I, you know, when I add a new car. I can spend a couple hours when I get back from like Springfield and I have a bunch of new cars.
Don Irace
So you don't take a car off the layout and replace it with another car? Would you do that?
Drew James
That's, that's the easiest situation is—
Don Irace
That's what I do.
Drew James
Yeah, I generally am doing that now because I have, I have about the right number of cars, but sometimes I'm not doing that. But you're right. And when it's, when I have a new boxcar and I'm just taking an old one off that doesn't, you know, doesn't meet the standards anymore, so to speak, um, uh, then it doesn't take that long. I can do that in 5 or 10 minutes.
Ray Arnott
Yeah.
Don Irace
See, I went, I went on a roll. I bought a bunch of home shop cars. high cube boxcars for my paper mill. So what I did is I just got the cars, I weathered them, I put them on a layout, but I pull one of the Athearn blue boxcars off and throw it in a box, you know, because I don't want it. I don't want any more cars on my layout than I have.
That's it. And I'm the same with you. I started off with the car cards on this, on this new layout too, and I immediately went back to— went to switchless because I found that the switchless is more for me to control.
And I just do an Excel spreadsheet. You know, and, and it works out fine for me. It takes me not even like a half an hour, 3/4 of an hour to redo the switch list, print them all out, and I'm ready to go for the next session. But I don't miss the car cards. I don't miss the boxes on the side of the layouts. I don't miss none of that stuff. I never seen a prototype building with a car card box on it.
Ray Arnott
Yeah, well, the car card box is supposed to be the prototype pocket, isn't it? Like, that's the pocket of the conductor, right? You know, and coming from somebody, I'll speak on behalf of the guy with the super small layout. For me, like, if I add another car to any of my trains, I've completely goofed all my logistics because I have no room for expansion. And that's one thing, you know, that you, if you're able to consider, if you have that room or don't run everything to 100% capacity, give yourself a little bit of room to grow or a little bit of expansion room.
Like yards. Like my yard, there's no room. There's no more cars in the, in, in what I— in the Plainfield yard. Like if you added another car, it's, it's gonna be jamming something up or it's gonna be sitting on the, on the, on the grade crossing. So again, it's what you're talking about there.
If you have a layout where you're able to have that little bit of— just give yourself some cushion. And I wish I would've been able to give myself a little bit more cushion and not just jammed up all the logistics. And then the other point I wanted to hit, and it's kind of like that battle, right? Car cards and waybills versus switch lists. And I've used both and I think there's benefits to both.
And the benefit I feel for car cards and waybills goes back to your point of the operators really don't care. Like, it's like all the research I've done, all the logistical things I figured out. Okay. I know that gaff shingles come from this place and they're going here and there, and I've got all that detail.
And Don comes over and he goes, I don't care. I'm just moving, you know, just— Tell me where that car goes. Right. So, you know, it's, it's, it's funny. It's, it's really about you. I mean, it's a— and because the operators, they don't notice the things you think they notice and they, and they're not paying attention to those details. And honestly, they don't care. They just want to be able to operate it.
Good operators want to operate it the way you want it operated. But all that little inside baseball stuff is really only important to you. And I think you've kind of hit on that with what you were saying earlier.
Drew James
Well, right. They don't notice. I can remember when I was making my waybills up and I I had these, you know, and I had an atlas spread out in front of me with maps trying to come up with new places and doing research. And yeah, at the end of the day, all they wanted to know was, where does this boxcar go?
Don Irace
Yeah, right. Yeah, you're lucky because I only have— I got 3 rotations, you got 6. And even at 3 rotations, my guys would never realize they spotted that car there 3 weeks ago. They just don't— they're oblivious to that, you know what I mean? They just— they're at— they're in the moment. or what they're doing now, that in their mind what they did last week doesn't matter, you know what I mean?
So I, I totally agree with that.
Drew James
I, I just took some time to update my switch list, and I had been, I had been thinking about that. I'm spending, you know, we've all been spending a lot of money on sound engines, and I have all these beautiful sound engines, and I noticed my operators were rarely— I mean, they had the sound on, but they were rarely using any of the other functions that are, that are coming with, you know, engines now with sound decoders.
And, um, so I updated all my switch lists to add in all the, the function keys because my, my engines are— don't change what trains they're assigned to. So I could now give them a switch list for a train, and I've added on that switch list all the function keys for the, uh, for the engine. I had tried to paperclip it onto the side of the switch list, and those paperclips were getting in the way of everything.
So I, so I just kind of redesigned my, uh, my switch list to add all the, add all the function keys. So that's, that's a benefit I have of my engines pretty much running the same engines on the same trains every, uh, every session.
Don Irace
I put that function thing on the back of the throttle. I made a little paper It's listed right on the back of the throttle. So all they have to do is turn the throttle around, tells them everything they need to know.
Drew James
But that's tough because a lot of them are— the engines, I guess you're probably function mapping, right? So that it's always the same keys for the same— like, I just got a couple of new Rapido engines in and there's probably 18 function keys, you know, that, you know, that— The factory decoder—
Don Irace
the factory decoders are hard because they they have it set up the way they want it set up when they deliver it to you. And you're right, because I've had a couple of people buy a factory locomotive and they've for some reason made changes to it, messed it up, and then they just go back to say ESU, for instance, and they just download a locomotive prime mover. But the problem is if they don't go into the factory settings of that decoder where the files for the factory ones are, they lose all their lighting effects and everything.
You know, so it's, it's tough.
Drew James
So, so another thing I wanted to bring up that I do that I think is a little bit different on the CS&P— Ray brought up yards and the yard on the CS&P. So I really wanted the yard job to not be a stressful job for guests. I wanted guests to be able to come in and run the yard without being— and really have enjoyed the session and not felt like were just overwhelmed.
So what I do in the yard I think is a little bit unique in that if a car comes into the yard in that session, it's going to still be in the yard at the end of the session. So every car that's needed for the yard operators to make up the trains for that day are actually in the yard at the beginning of the session. Now I have a big enough yard to be able to do that.
And so that means that if a train is late getting in and they were supposed to get cars off of it, they don't all of a sudden fall behind because, you know, they couldn't get out train A, they couldn't get out train B until train A came in and train A got delayed and now they're behind and they're, you know, they're stressed out.
Don Irace
Freaking out.
Drew James
Yeah. And so every car, if they, if This is 98% true. There's a couple of cars that have to make connections during the op session, but for the most part, they don't. And so it's to, you know, so I really want my operators to have a good time. I don't want them to be real stressed out.
The other thing that I'm able to tell them in the yard is for all the incoming cars coming off the trains they deal with during an op session, I always tell them, If you don't get those cars blocked into the— onto the right tracks for the next op session, it's okay.
It's okay. I'll just have to do some restaging in between.
So focus on getting the trains out on time, and you have all those cars all ready to go. And the incoming cars, if you can get them blocked correctly for the next session, that's great. And, and I'll say this, almost all of them do. But I think it takes some stress off of them knowing that, hey, if that work doesn't get done, the session will move along.
It won't be held up. So, you know, I really— I want them to enjoy themselves because I've worked in yards and op sessions where, you know, I'm halfway through the session before I've really figured out what's going on in the yard. And now I'm way behind. And it can be very stressful instead of the fun job that you're trying to make it.
Don Irace
Right. Did you ever have an op session where you didn't have to do any type of restaging at all after it was over?
Ray Arnott
Never.
Don Irace
Oh, no.
Drew James
Well, I'm gonna take that. I'm gonna say no, no, no, no. I take that back because now I know, understand what you're asking. I have to do a lot of staging between op sessions. However, um, I, I actually, it, it, the first thing I do when I'm restaging is I do what I call the QA check, where I go around and check to see if every car that's on the layout, as opposed to ones that are in staging, if every car that's on the layout is in the right place.
Don Irace
Right.
Drew James
And I would say it's happening more and more. As a matter of fact, I sent out a note to everybody who operated during the NER and said that I did not find a single car out of place. Every car in the yard and every car in every industry and every town was exactly where it was supposed to be. That was surprising to me because only 1 or 2 people had ever operated here before.
And those that had, well, The guy in the yard, Ed O'Connell, knew what he was doing. So he's operated here several times.
Don Irace
Ed's a good man.
Drew James
But outside of Ed, there were guys that had never operated here or it had been years ago when they had operated. So I was impressed.
Ray Arnott
The last time I operated over there, I didn't get a progress report. So I'm kind of wondering, but I'm gonna go back because you made a great point. And this is exactly what I found. This is why I really enjoy going and operating your layout, Drew, is that you have that mentality that it's— you want a challenging operating session, you want it but enjoyable, and not where you're banging your head against the wall or you're stressing or it feels like work.
Like, and I found that, like, I've switched 3 of your areas. I've switched Nelson, Castlegar, and Kettle Falls. Now I've done, I've done those 3 jobs. And what I like about what you've done is you leave— it's not like it— there's only just enough room and it has this magic recipe that has to be a certain way.
Like, you give a— you give some margin, and, and that is enjoyable because it's not, oh well, I have to make exactly this move to make this happen. It definitely makes it a lot more enjoyable. And then you have that mentality, and it's great.
Drew James
Well, I'm glad you Feel that way when you've operated here because it's definitely a goal.
Don Irace
Yeah.
Drew James
So it's, it's definitely trying for people to enjoy themselves and not feel like it was stressful or not feel like, hey, I made a fool of myself because I couldn't get this job done, you know, so, or I screwed it all up. So, you know, it's about having fun. And, you know, when I, when I built this railroad, I definitely built it. And I know that that's not always the case. Some people build a layout and they know it's going to be like the same set of guys are gonna operate there, you know, every other week.
And on the CS&P, it's— yes, I have a set of, I'm gonna call it 15 regulars that operate here fairly often. But I have, you know, I probably have 50 people on my invite list of folks who are, you know, local or fairly local. And they don't get to operate here that often.
And, and then, you know, I host events for out-of-town guests who are coming in for their— it's the only time they'll ever operate on it. And so you want them to have a good time.
Don Irace
Absolutely. I know, I know that all the times I've operated there and I've probably operated probably almost those 3 jobs that you operated and I've done some through trains and stuff, but I've always had a good time. Everything has always ran good. There was never problems with anything, you know, no locomotive problems, no car derailments, none of that stuff. And if it was, it was self-inflicted. But it's, you know, I mean, you can't take that factor out of it.
There's a lot of self-infliction that goes on when you're operating. Not always the layout's fault, but I always had a good time.
It's a perfect operation as far as I'm concerned. I mean, all those layouts up there have all been great. I mean, I've enjoyed operating on all of them up in the Syracuse area.
Ray Arnott
Yeah. I mean, that's what I always wonder. It's like I got to move up to Syracuse. I mean, there's just— you got such a great group up there. I mean, the wrong way.
Drew James
Yeah.
Ray Arnott
I think you were trying to get away from snow. If you're trying to get away from snow, that would be the wrong direction to travel.
Drew James
But yeah, we only get about 10 feet a year. Yeah, only.
Don Irace
Yeah. Let's, uh, let's get on the subject of the wye.
Drew James
The wye.
Ray Arnott
Which wye? W-Y-E?
Drew James
Why?
Don Irace
Track wye.
Ray Arnott
Track wye.
Drew James
Yeah. All right. Yes. So there is a wye on my layout. Why there's a wye, I do not know.
Ray Arnott
Maybe that would be the title of this episode. Why is there a wye? That might be the winner.
Drew James
So when I designed the layout, there was a place between what we call the Nelson Industrial Area and the Nelson Yard that a wye was kind of a natural fit. And so back when I was designing it, it was sort of like, yeah, I'll put a wye here. And I thought, oh, maybe there'll be a train that comes out of that industrial area You know, I wasn't really sure what it was going to be used for.
And as the operation has evolved, it's turned out that we've never used the wye. There's nothing that needs to be turned in the course of an op session. And so it's never been used. And as a matter of fact, one of the legs that is never used of that wye— one leg is the entry into the industrial area, the other leg is the mainline, and the third leg, I scenic so that it looks like it's never used.
It's got weeds growing between the track.
It's, you know, it's, you know, I decided, hey, it's never get used, so it ought to look that way. And so sure enough, I'm listening to Tim Garland's episode that you just had him on recently. And he talked about on the prototype of that occasionally you get a car that has to be Unloaded on a particular side.
And so I heard that and the light bulb went off in my head. So now I have a use for this why. So, so I don't know if any of my regulars who'll be coming to my next op session will be listening to this or when this episode will come out, but whoever gets the Nelson switch job is gonna be surprised Or maybe not surprised if they've heard this episode, that there's gonna be a note on the switch list
that's gonna tell them that a particular boxcar has to be a particular side to the loading dock in one of the industries. And we'll see how that goes over. I have a feeling that the operator of the Nelson switch job will think that's great and won't have a problem with it.
The dispatcher might not be very happy. Because normally a train goes into the industrial area and it kind of disappears off his board for quite a while and he doesn't have to think about it. And all of a sudden that guy's gonna be calling him up saying, hey, I need to use the main line to turn this boxcar.
Don Irace
It's gonna be fun though. It's gonna be fun.
Ray Arnott
Well, it's gonna be fun and you ought to set up a camera and record the first guy to do it, right? Because we were talking with Tim and he was talking about how many guys accidentally, they'll end up wyeing the engine. The engine will be facing the wrong way, but the boxcar never changed. So it'll be interesting to see how they handle it and how they figure out, okay, I gotta get this boxcar to the opposite side.
So yeah, set up a camera there and then maybe we'll put a little Benny Hill music behind it as they try to get this figured out.
Drew James
My, my, since my last op session was all guests, this one coming up is pretty much going to be all regulars.
Don Irace
So to be honest, I won't mind if they have a little stress or a little, you know, that's going to be that's gonna be cool because not, not a lot of railroads have that option. You know, I, I, I'd like to do it, but I just don't have room to put a wye in, so it's not going to happen on my layout. So these guys are going to make sure they'd be able to unload boxcars on both sides.
Ray Arnott
How much room does that wye take up?
Drew James
It, it doesn't take up that much room. It's a small wye. It can only handle, you know, uh, I was gonna say it can only handle an engine and a car in each leg, but It's probably only 4 square feet or something like that. It's not that— it depends on what you include in the wye, right? Because one end kind of goes into the yard, the other end's the mainline, and the third is the lead into the industrial area.
Don Irace
So have you sent the MOW crew out there yet to clear all the grass and the weeds and everything and the stumps and the trees growing on that track?
Drew James
So just to continue this story, before the ops session at the NER, I had an open house And there was a good period of time when there was nobody in the basement besides myself and one of my buddies, Ed Olszewski, who was helping me with the open house. And so I said, you know, I told him I was gonna do this with the Y, and I said, you know, I'm pretty sure I wired it up.
I think I put an auto reverser under there, but nothing has gone through it in so long that I'm not sure. So we We did run an engine around the wye, so I do know that there was an auto reverser installed and there actually is power to it.
Ray Arnott
Because I was—
Drew James
I was— it— I mean, it had been 5 years since, since anything had gone down that one side of the wye. So yeah, I wasn't even certain that the auto reverser was still installed or if I'd pulled it out or what.
Don Irace
That's gonna be— that's gonna be cool. They're gonna enjoy that. It's different, you know, it's something way different than they used Yeah, definitely. That could be the next favorite job on that railroad, you know what I mean? Doing that job. Well, we get to turn that car around.
Drew James
Well, you know, speaking of, speaking of that, I think it's— I've been interested how things have evolved. When, when I first started operating the, the railroad, um, a lot of, a lot of my regulars really wanted to run through trains, or they, you know, they wanted to run something over the main line. And I had a lot of through trains scheduled and they were very popular. And over time, what I'm seeing is my crews definitely want to do more switching.
And the jobs that are popular, the Kettle Falls job that you did, Ray, the last time you were here is definitely the most popular job.
Don Irace
Yeah.
Drew James
I would say. But, you know, they, they want to run those turns. They want to run Northport and Castlegar and the Nelson switch job. Those are very popular. I have a, I have a few guys that always want to run the yard. And the, and the road crews, you know, people are still happy to do them, but they're definitely less popular than they had been before. And as a result, I've been having to change my train lineups a little bit and what the different trains do.
So now almost all my mainline trains do something.
I used to have— I think I only have a through freight in each direction that really doesn't do any switching at all, one in each direction, but I used to have several. And now I've managed to at least provide some work on pretty much every mainline train. So because, you know, just to provide a little bit more interest to the operators.
Don Irace
Yeah, you go, you mostly get guys like visitors that come, you know, like during conventions and stuff like that to do. A lot of guys just do through trains because they really, they're not really sure if they don't, they're afraid to do the switching, so they'd rather just run the through trains through. But, but you're right, you know, regular operators, even with me, we, well, we don't have any through trains really.
The only through train I have is Actually, the interchange train, it runs between Worcester and Valley Falls, and it switches on the way up and it switches on the way back. It still does something. So basically I have all switching jobs. I don't have any through trains at all.
Ray Arnott
Well, I think that mentality changes too. And here's somebody, you know, hasn't been operating for as long as you 2 gentlemen have. I think part of running, they go to the through train, it's harder to mess up a through train than it is a switch job, right? As long as this was CTC, if you follow the signals You can't really mess up a through train. And, and there's other layouts. And that's why I think it's great, your mentality with switching and how you've got your operations set up with a little bit of ease and more about aimed on fun.
Because there are other guys out there that don't quite have that and you feel obligated to make sure you get it exactly. And you just, you get that nervous feeling. But as you get comfortable with a layout owner, then you can start to understand and it gets you a little bit where, okay, if I mess up, I'm not gonna get kicked out or I'm not gonna be invited back again.
They're gonna laugh with you. And, you know, and that's— and, but that's— I think that's a true thing. I think, you know, there's some anxiety to going to somebody's layout for the first time or even the second or third time and making sure that you're doing it right so that you continue to get invited back.
Don Irace
I don't— I wouldn't necessarily say the guys running the 2-trains couldn't mess up because if they're talking to somebody, blow through a red light, the dispatcher's not gonna know.
Ray Arnott
That's true. It's a little harder. I mean, you gotta really work hard to mess it up. Like, You know, you learned when you were 16 years old that red is stop and green is go. I mean, hopefully that you've been able to retain that.
Don Irace
Then you turn around, then he turns around and see the signal. Was that thing green or was it red when I went through it?
Ray Arnott
Although there are videos, there's a video of me online of me going through a red signal on our good old friend Joe Grissetti's layout. Of course, that signal was facing east-west and I was looking north-south, so you couldn't even see it.
Drew James
But that happens.
Ray Arnott
It can be done, no doubt. I can do it.
Drew James
That is not an uncommon thing, Don. So I'm laughing where somebody will pull through the signal. And of course, as soon as they get on the OS section, you know, on the OS section, the signal turns red. And now they're not sure, was that signal red before I pulled up or not? And now it's, you know, they're like, oh, it was red. And it's like, well, it was red because— They got this backup.
And then they back, you know, They, you know, they get all, uh, it's like, you know, sometimes then a dispatcher starts yelling, what the heck's going on over there? Yeah, yeah, yeah, it definitely happens. But speaking of mainline trains and switching and all that, you know, one of the things that I've, you know, I, I don't want to say struggle, but I, I keep trying to refine and, and, and make better, and, and, and it's, it's, it's such a big compromise is that The local turns
and where there's a lot of switching and in the yard, that all wants to be slowed down. It all wants to be slowed down.
I mean, I'd love for those guys to have proto throttles and really take their time and figure out where the brakemen would be, all the things that you talk about, Ray, like on your smaller switching layouts. The problem with that is if I slow that all way down, Then the issue gets to be that the mainline trains and the other trains, they're— they— it's hard to slow them down to the same amount.
And if I slow down the fast clock, like I've run a— I used to run a 6-to-1, then I slowed it to 4-to-1, and, and actually I've kind of compromised now. I run 5-to-1 because as I— I would kind of like to have— I like the slower fast clocks. To give people more time to do their jobs. But what that resulted in was crews having too long of a time between trains.
So people were sitting— if you're running mainline trains, people are sitting around waiting for their next train to go. And so I've tried to find a compromise between what I think are almost two competing— Aspects where the crews were running mainline trains.
I want them to not be spending too much time waiting between trains, but I want to give the locals plenty of time to not have to rush. So that's been something that I've continued to tweak a lot over the years. And sometimes it depends on who my crews are, but it's something that I tweak and I'll probably continue to tweak.
Don Irace
I mean, I, I mean, like I said, I've operated your layout and I've sat in the crew office waiting for my next job. And to be honest with you, I kind of like a little bit of a break. You know, you get to sit down, get off your feet, and then the older you get, the better you like it. You know what I mean? Because it starts— everything starts hurting your feet mostly.
And you get, you know, like you always have refreshments, you got something to eat, something to drink. Because I don't like people bringing drink and food on my layout. I don't allow none of that in the layout room at all. You know what I mean? So you got a good idea and I think what you're doing is fine.
It's not a long wait, you know, and it kind of clears your mind from what you did and then think about your next job and what you're going to do. So I think you're fine. I wouldn't adjust it at all.
Ray Arnott
And what I also like, and I mentioned this to you, Drew, is that, you know, that social aspect of it as well with the crew lounge. I found in the times that I've operated, you don't go in there, you sit there, It's usually not the same people twice. So at least you get to sit with somebody else, you get a little bit of chat, get to introduce yourself. So, you know, I love that social aspect of it.
And you've, you've got a great setup, you know, with that crew lounge right outside the layout room. And I think we missed, you know, one of the things that's great about— another thing that's great about your layout is the room that it's in. You have the way it's set up. You can't see the entire layout from one spot, right? And it gives you that illusion of even bigger size.
I mean, it's a nice size layout, but it gives it an illusion of even bigger because you can't— you're not seeing 150 scale miles ahead. You only see really the areas that you're working in, which is really a cool effect.
Don Irace
Then you go down a little aisleway and then you go around the corner, there's like a whole nother room of layout in there. Yeah, I was like, wow, where'd this come from? You know, it's perfect. I tell you, I wouldn't— I mean, you do a good job. I've really enjoyed myself. I'd love to come back more, but I don't see anything really you need to change, buddy.
Ray Arnott
Wow, Roy. Do you feel that way, Drew? Do you feel that way, that you've mastered it?
Drew James
You know, yes and no. I mean, I feel really good about the way the op sessions go, and I— I feel as though my guests all have a good time. But there's no big but there. The only thing is I do wanna keep my regulars interested. So trying to do new things every once in a while so that 10 years from now, I can't be running the same trains and doing the same thing.
So that is on my mind, which goes back to the timetable and train order discussion we had. And it goes back to these little things like the Y that's gonna show up, you know, to change a boxcar. One of the things I did in the last year was I added a customs check for the passenger trains when they cross the border between Canada and the United States.
They have to pull a random card out and see how long the customs check is gonna be. I could see adding other things in where there's, you know, maybe there's a, I don't know, a maintenance away crew out there with slow orders. And so I'm always looking for new things I can kind of throw in there that'll change it up a little bit so that it's not the same old, same old for my regulars.
Don Irace
Now, may I have one more question? When you guys, your regulars come, how often are they allowed to do the same job over again? Do you space it out so they keep familiar with every job you have on the layout?
Drew James
Are they allowed? So the way that I assign jobs is I ask people when they're coming to tell me what job they would like to have. And so if there's no conflicts, I'll give them the job. If there are conflicts, I often will, you know, say, well, I can't give you Kettle Falls. I gave that to somebody else. So I'm gonna give you the Castlegar turn, which is, you know, another good switching job.
Don Irace
Only fair. Yeah.
Drew James
So, so that's not an issue. The only, the only real issue I have is, is dispatching, to be honest. It takes a little bit to get up to speed to become a dispatcher. And then the issue is, is that Once you become, you know, I'll say, you know, qualified or, you know, competent on the machine and know what you're doing and understand what trains need to go out before other trains or it causes problems and all that, it's hard if you then go 6 or 8 months and don't do
that job again.
Don Irace
Right.
Drew James
And so I have a number of people, including yours truly, me, who would like to dispatch, But it's hard to get people time in that seat, in the hot seat, so to speak, so that they can competently do it. And if you're giving them a lot of time so that they can competently do it, the other people who have learned, now they're going a long period of time without getting a refresh.
So that's probably the position that I— struggle's the right word, you know, that I, you know, that I wish I could do something there, but there's going to get to be a limit of the number of dispatchers I can really have.
Ray Arnott
Yeah, that's got to be a hard balance, right? To try to keep guys that are fresh and then they're not available. So you got to have somebody that can do it if you're holding an ops session. So you got to have a backup. But yeah, again, and I'm looking at, I have a picture of the CTC panel up on my monitor here and we'll share that on the link for the show here.
Or on the page for the show. And there's a lot going on there. There's a lot to watch. There's a lot to— so yeah, yeah, I would imagine if you haven't done it in a while, you'd probably sit in front of it and have to think for a little bit.
Drew James
Yeah, it's, it's not, you know, like I just gave a clinic on how to use the machine at the NER convention. And, you know, I—
Ray Arnott
and I—
Drew James
so I tell you that I, I gave a clinic on how it works, and at the same time, I've never actually dispatched my own layout. And I have dispatched because it's been a little while, but I used to, and I need to start it again. I used to have some kind of training sessions where I would just get maybe 3 or 4 guys to come over and we would just run trains, not use a switch list or anything.
We'd just run trains around while we took turns actually dispatching and lining up, setting up the routes and everything. And what I learned from that Sitting in the chair there is, oh, it's easy to get one train over the railroad. It's not too hard to get 2 trains in opposite direction to have a meet and get over the railroad. But as soon as you start having 3, let alone 4 trains out on the main line, it's all of a sudden what seems very simple and straightforward becomes very convoluted.
Don Irace
Yeah.
Drew James
It becomes a very challenging situation.
Don Irace
I don't have that problem with mine because I got a remote dispatcher, so there's no fighting going on about that.
Ray Arnott
Yeah, he can hit mute and grumble under his breath back there. You don't have anybody, uh, with your dispatch. I know one of the gentlemen, I apologize, I don't remember his name, but yeah, he, you could tell he was getting a little, uh, maybe cranky. Yeah, just slightly cranky in there, you know. And the, the big thing, I guess, and this is the same thing Don does when he's, uh, dispatching Mark's the pet peeve of push the button, wait a second, then start talking, then let up on the button.
It's like just simple radio. Maybe that'd be a clinic that needs to be held. So how to use a radio, because, you know, that does— it is a pain when you get cut off and can't hear what people are saying.
Don Irace
And it happens every time too.
Drew James
So it definitely happens every time. And sometimes I have to walk, you know, the other thing that happens, I'll have to walk around it. And go— so one of the things that's happened with the radios in the last year, another kind of upgrade is I upgraded all the radios. I replaced all my old ones with new ones. And I also now have headsets for all the crews. And my crews like that and I like it because it cuts down on the noise in the train room.
So—
Don Irace
Exactly.
Drew James
And you're not getting the feedback that you would get before. But it does result in some funny situations where it's like the dispatcher will tell me, hey, you know, so-and-so, their radio's not working or whatever. And so I walk over to where that person is and I have to put the microphone down in front of their mouth because it's sticking up in the air like an antenna.
Ray Arnott
It's amazing how that works, isn't it? The sound comes from the mouth. It doesn't come from anywhere else.
Don Irace
Yeah.
Ray Arnott
But some guys too, they get so concentrated with it.
Don Irace
what they're doing. You call them on the radio and they just don't even answer you. You know, it's like, send somebody, tell him to answer the radio, please.
Ray Arnott
Somebody go tap him on the shoulder.
Don Irace
Yeah.
Ray Arnott
Wake him up.
Drew James
It does happen.
Don Irace
Sure. It's all in fun. All in fun.
Ray Arnott
Yeah, for sure. And fun is exactly what the Canada Spokane and Pacific is when you operate it. And it's been a blast having you here, Drew, to talk about the, the CS&P. And we finally crossed that line. I went back and looked, it was July 4th that episode came out. So it's been well over a year. You've been more than patient, and it was— I hope everybody will think it was well worth it to wait for Drew to give the rundown on his ops.
And you ever find yourself out in that central New York area and you have an opportunity, this is one of the great layouts to go check out.
So absolutely. So Drew, thank you so much for coming by and spending time with us tonight.
Don Irace
Thank you, Drew. Appreciate you being here.
Drew James
Thanks for having me. This was a lot of fun.
Ray Arnott
Thank you for joining us for this episode of Around the Layout. Learn more about today's episode, check out past shows, and much more on our website aroundthelayout.com. Show your support by becoming an operating crew member at aroundthelayout.com/crew. Follow us on social media aroundthelayout.com/social and send us your feedback aroundthelayout@gmail.com. Thanks for hanging out with us around the layout.
Also generated
More from this recording
ATLP - Publishing QA
PEOPLE
Ray Arnott
Ray Arnott
entire transcript
HIGH
Don Iris
Don Irace
[00:02:05], [00:02:12], multiple occurrences throughout
HIGH
Drew James
Drew James
[00:02:34], and throughout
HIGH
Ed O'Rourke
Ed O'Rourke
[00:09:24]
HIGH
Bruce Ryan
Bruce Ryan
[00:09:41]
HIGH
Bill Brown
Bill Brown
[00:04:18], [00:08:59]
HIGH
Ed Olszewski
Ed Olszewski
[00:46:20]
HIGH
Ed O'Connell
Ed O'Connell
[00:38:20]
HIGH
Kevin Udally
Kevin Udaly
[00:18:46]
[VERIFY]
Doug Geiger
Doug Geiger
[00:18:49]
HIGH
Ken Cameron
Ken Cameron
[00:19:13]
HIGH
Dave Martini
Dave Martini
[00:19:13]
HIGH
Tim Garland
Tim Garland
[00:43:19]
HIGH
Joe Grissetti
Joe Grissetti
[00:51:16]
HIGH
Mark
Mark
[01:01:48]
[VERIFY] (likely refers to "Mark" as a dispatcher, context unclear)
Soudro Brown
[VERIFY]
[00:10:43]
LOW – Possible name; verify spelling and identity.
LAYOUTS / PROJECTS
Canada Spokane and Pacific Railroad
Canada Spokane and Pacific Railroad (CS&P, CSMP)
throughout
HIGH
C&O layout (Kevin Udaly)
C&O layout
[00:18:46]
[VERIFY] (spelling “Udally” vs “Udaly”; layout context accepted)
Colorado Model Railroad Museum
Colorado Model Railroad Museum
[00:19:06]
HIGH
RAILROADS / ORGANIZATIONS
New Haven
New Haven
[00:00:00], [00:00:22]
HIGH
Burlington Northern
Burlington Northern
[00:14:03]
HIGH
Canadian Pacific
Canadian Pacific
[00:14:03]
HIGH
Lakeshores Division
Lakeshores Division
[00:03:55]
HIGH
NER (Northeastern Region, NMRA)
NER
throughout
HIGH
Central New York Division
Central New York Division
[00:08:14]
HIGH
NEARC
NEARC
[00:07:16]
[VERIFY] (transcript: “NEARC region,” probably means "NER" or "NER Region")
ShipIt
ShipIt
[00:26:20]
HIGH
JMRI Ops
JMRI Ops
[00:26:20]
HIGH
NMRA
NMRA
Implied via "NER" and national conventions
MEDIUM (not explicit, but likely)
MANUFACTURERS / COMPANIES
Broadway Limited Imports
Broadway Limited Imports
[00:00:05]
HIGH
Oak Hill Model Railroad Track Supply
Oak Hill Model Railroad Track Supply
[00:00:58]
HIGH
Scale Signs
Scale Signs
[00:00:31]
HIGH
Rapido
Rapido
[00:33:39]
HIGH
Athearn
Athearn
[00:28:51]
HIGH
ESU
ESU
[00:34:03]
HIGH
Home Shop
Home Shop
[00:28:49]
HIGH
PRODUCTS / MODELS
HO scale brass hybrid New Haven R3A Mountain
HO scale brass hybrid New Haven R3A Mountain
[00:00:05]
HIGH
Paragon 4
Paragon 4
[00:00:16]
HIGH
Stealth Series
Stealth Series
[00:00:16]
HIGH
Roadmaster Flexible Turnouts
Roadmaster Flexible Turnouts
[00:00:58]
HIGH
high cube boxcars
high cube boxcars
[00:28:49]
HIGH
Blue boxcars
blue boxcars (Athearn)
[00:28:51]
HIGH
proto throttle
ProtoThrottle
[00:52:37]
MEDIUM (was lowercase and generic, but product is ProtoThrottle)
laser-cut tie base
laser-cut tie base
[00:01:05]
HIGH
precision tie plates
precision tie plates
[00:01:05]
HIGH
DCC
DCC
[00:00:16]
HIGH
LOCOMOTIVES / ROLLING STOCK / TECHNICAL TERMS
3 cylinders, Mountain Class
Mountain Class
[00:00:00]
HIGH
yard throat
yard throat
[00:11:14]
HIGH
staging yard
staging yard
[00:14:30]
HIGH
cardboard boxes for industries
cardboard boxes for industries
[00:10:33]
HIGH
car forwarding
car forwarding
[00:24:06]
HIGH
car cards and waybills
car cards and waybills
[00:24:19]
HIGH
switch lists
switch lists
multiple
HIGH
track warrants
track warrants
[00:16:55], [00:22:00]
HIGH
timetable and train order
timetable and train order
throughout
HIGH
CTC (Centralized Traffic Control)
CTC
throughout
HIGH
fast clock
fast clock
[00:21:00], [00:53:11]
HIGH
auto reverser
auto reverser
[00:46:44]
HIGH
benchwork
benchwork
[00:10:28]
HIGH
restaging
restaging
[00:36:29], [00:37:27]
HIGH
certified dispatcher
certified dispatcher
[00:19:57]
HIGH
NMRA AP | [VERIFY] | Not explicitly stated—AP could be inferred but not mentioned. mainline, single-track mainline | mainline, single-track | throughout | HIGH yard, yard operator, yard job | yard terms | throughout | HIGH through trains | through trains | [00:48:11], [00:49:23], [00:50:00] | HIGH local(s), local turns | local, local turns | [00:14:40], [00:52:34] | HIGH Kettle Falls job | Kettle Falls job | [00:48:01] | HIGH Castlegar turn | Castlegar turn | [00:58:23] | HIGH Nelson switch job | Nelson switch job | [00:44:20], [00:48:20] | HIGH
EVENTS / LOCATIONS
NER convention
NER convention
[00:03:38], throughout
HIGH
Ops Till You Drop / Ops to You Drop
Ops Till You Drop / Ops You Drop / Opsya Drop
several forms [00:08:21], [00:08:33], [00:09:03], [00:10:17]
HIGH
Rochester
Rochester
[00:03:43], [00:03:46]
HIGH
Syracuse
Syracuse
[00:05:02], [00:08:14], [00:41:36]
HIGH
Long Beach
Long Beach
[00:05:54]
HIGH
Concord
Concord
[00:05:10], [00:05:16]
HIGH
Greeley
Greeley
[00:01:18]
HIGH
Colorado Rail Proto Meet
Colorado Rail Proto Meet
[00:01:18], [00:19:06]
HIGH
Springfield
Springfield
[00:28:12]
HIGH
Worcester
Worcester
[00:49:32]
HIGH
Valley Falls
Valley Falls
[00:49:32]
HIGH
Amherst
Amherst
[00:10:46]
HIGH
Plainfield yard
Plainfield yard
[00:30:13]
HIGH
Nelson, Castlegar, Kettle Falls, Northport, Calgary, Spokane
towns on CS&P
throughout
HIGH
RIT Conference Center
RIT Conference Center
[00:04:06]
HIGH
URLS / WEBSITES
scalesigns.com
scalesigns.com
[00:00:44]
HIGH
OHRTrackSupply.com
OHRTrackSupply.com
[00:01:11]
HIGH
corpm.org
corpm.org
[00:01:28]
HIGH
atlpxtra.com
atlpxtra.com
[00:01:35]
HIGH
aroundthelayout.com/50
aroundthelayout.com/50
[00:13:45]
HIGH
aroundthelayout.com
aroundthelayout.com
[01:04:18]
HIGH
aroundthelayout.com/crew
aroundthelayout.com/crew
[01:04:25]
HIGH
aroundthelayout.com/social
aroundthelayout.com/social
[01:04:31]
HIGH
aroundthelayout@gmail.com
aroundthelayout@gmail.com
[01:04:31]
HIGH
Note: “atlpxtra.com” is the intended ATLP newsletter site; “corpm.org” likely for Colorado Rail Proto Meet.
OTHER ITEMS REQUIRING VERIFICATION
Soudro Brown | [00:10:43] | Name is unclear. Could be "Sandro Brown," "Sandro Braun," "Soudro Brown," or similar.
Kevin Udally | [00:18:46] | Is this "Kevin Udaly"? Verify spelling.
NEARC region | [00:07:16] | Unlikely that "NEARC" is correct; probably intended as "NER" ("Northeastern Region").
Fine-Tuning Fun: Reducing Stress in Layout Operations
From Mainline Runs to Favorite Switch Jobs
Regional Meets & Ops Events in Central New York
Prototypical Challenges: CTC, Fast Clocks, and Crew Management
ATLP – Search Topics & Keywords
PRIMARY SEARCH TOPIC: prototypical operations on a proto-freelance model railroad
SECONDARY SEARCH PHRASES: proto-freelance model railroad operations designing mainline runs for operations developing yard jobs on large home layouts CTC machine use in model railroading switch list vs car card operations regional model railroad conventions NER switching-focused operating sessions model railroad traffic density and fast clock management creating engaging jobs for operating crews restaging practices for model railroad sessions
IMPORTANT NAMES & ENTITIES: Drew James Canada Spokane and Pacific Railroad (CS&P) Don Irace NER (Northeastern Region of NMRA) Ops Till You Drop event Bill Brown Nelson Yard (layout feature) HO scale Broadway Limited Imports [advertiser mention] Rapido [manufacturer mention]
YOUTUBE KEYWORDS: proto-freelance operations, model railroad operations, CTC machine, switch lists, car cards, yard jobs, HO scale, NER convention, Ops Till You Drop, Canada Spokane and Pacific, Drew James, traffic density, fast clock, regional railroad ops, layout design, model railroad events
ATLP - Create Guest Bio
GUEST NAME: Drew James
SHORT BIO: Drew James is the owner and designer of the Canada Spokane and Pacific Railroad, a proto-freelanced HO scale layout depicting a jointly-owned line between Calgary and Spokane in June 1978. His work centers on developing realistic and enjoyable operations, with a focus on mainline runs, yard management, car forwarding systems, and adapting layout design to enhance both guest and regular operator experiences. In this episode of Around The Layout Podcast, he discusses his layout’s operational philosophy, track planning choices, and adjustments made to facilitate effective group sessions.
ONE-LINE BIO: Drew James operates the Canada Spokane and Pacific Railroad, a proto-freelanced HO scale layout focused on realistic and accessible operations.
VERIFICATION NOTES: Canada Spokane and Pacific Railroad — verify exact layout name spelling. HO scale — verify for accuracy, inferred from context. Calgary and Spokane — verify these endpoints for the modeled line. June 1978 — verify as the operating era.
ATLP - Episode Chapters
00:01:57 Talking Ops Returns: Introducing Drew James And The CS&P 00:03:38 NER Convention And Regional Model Railroad Events 00:08:14 Operations Events And Evolving The CS&P Layout 00:11:54 Starting Operations Early And Adapting Layouts 00:13:53 Overview Of The Canada Spokane And Pacific Railroad 00:16:25 Designing For Operations: Mainline Runs And CTC 00:17:25 Implementing CTC, Traffic Density, And Dispatching 00:24:00 Developing Car Forwarding And Switch List Methods 00:34:29 Yard Operations Philosophy And Guest Experience 00:41:51 Track Wyes, Special Moves, And Operational Variety 00:47:26 Switching Vs Through Trains: Operator Preferences And Tweaks 00:53:48 Balancing Fast Clocks, Breaks, And Crew Social Aspects 00:56:12 Keeping Operations Fresh And Managing Crew Assignments
ATLP - Create Spreaker Description
OPENING QUESTION: How does a layout owner balance operational complexity and guest enjoyment on a large-scale proto-freelance railroad?
DESCRIPTION: Drew James joins Around The Layout Podcast to discuss the operational design and evolution of the Canada Spokane and Pacific, his 1,500-square-foot, proto-freelanced HO scale layout set in June 1978 and jointly owned by the Burlington Northern and Canadian Pacific. The episode focuses on the practical decisions and tradeoffs Drew makes to deliver rewarding operating sessions for both regulars and guests, emphasizing approachable CTC-based traffic control, flexible switchlist systems, and the importance of keeping the experience enjoyable rather than overwhelming.
The conversation covers the reasons behind Drew’s operating scheme choices, including why he prefers CTC over timetable and train order for regular sessions and how switchlists have replaced car cards and waybills in his system. Drew describes adapting his approach as regular operators’ preferences evolve, ensuring operational variety, and deliberately designing yard and mainline flow to reduce stress and waiting. The discussion also touches on creating new challenges—like introducing a long-unused track wye into the session—and practical staging, restaging, and dispatching methods on a railroad designed for both social and operational enjoyment.
IN THIS EPISODE: • Deciding between CTC, timetable and train order, and other traffic control methods • Moving from car cards and waybills to a custom switchlist system • Designing yard operations for accessibility and reduced operator stress • Adapting operating jobs as crew preferences shift over time • Introducing new operational challenges—including creative use of a previously unused wye • Balancing realism, variety, and enjoyment for both regular and occasional operators
LINKS MENTIONED: Canada Spokane and Pacific Railroad — [URL NEEDED] NER Convention (NMRA Northeastern Region) — [URL NEEDED] Ops Till You Drop — [URL NEEDED] JMRI Operations — https://www.jmri.org/ ShipIt — [URL NEEDED] CORPM (Colorado Rail Proto Meet) — https://corpm.org/ Scale Signs — https://scalesigns.com/ Oak Hill Model Railroad Track Supply — https://OHRTrackSupply.com/ Broadway Limited Imports — [URL NEEDED]
Learn more about Around The Layout Podcast at aroundthelayout.com.
ATLP - Create Squarespace Episode Article
E126_Ops_James_Rewind2_mixdown
Drew James joins Around The Layout Podcast to discuss the evolution of operations on his Canada Spokane and Pacific Railroad (CS&P), a proto-freelance HO scale layout inspired by prototype practice and creative planning. The conversation explores the operational philosophy, systems, and tradeoffs that influence how a railroad can be purpose-built for fun, approachable operations—especially for visiting operators.
The discussion centers on practical decisions behind developing a layout with flexibility and operator enjoyment at its core. With experience hosting sessions for both regulars and new guests, Drew considers how tools like CTC signaling, car forwarding systems, and purposeful staging can shape the operating experience. The episode takes a close look at what works, what gets refined, and how the operating crew’s preferences and feedback inform ongoing changes.
About This Episode
The primary subject is the operational design and ongoing refinement of the Canada Spokane and Pacific Railroad, a north-south proto-freelance route situated between Calgary and Spokane. The layout is structured around long single-track mainline runs, five towns, and a double-ended staging yard, supporting an operational focus that prioritizes both plausibility and approachability. CTC signaling and carefully designed yard procedures aim to strike a balance between prototype practice and enjoyable, stress-free model railroad operations.
Decisions discussed include the transition from car cards and waybills to spreadsheet-driven switch lists, adjustments to train lineups to match operator interests, and the use of prototype-inspired features—such as a wye that now finds operational purpose thanks to insights from real-world railroad practice. Throughout, the conversation considers the challenges of maintaining interest for a rotating mix of visiting and regular operators while minimizing operational stress.
What We Discuss
Designing Operations for Guest-Friendly Sessions
Drew explains the importance of building a layout that is easy for guest operators to understand, starting with accessible CTC signaling rather than timetable-and-train-order operation. Switch lists are preferred over car cards and waybills to streamline car forwarding—especially when most operators are interested in clear guidance over detailed paperwork. The priority is to keep jobs enjoyable and avoid overwhelming first-time visitors.
Refining Systems Through Ongoing Feedback
The operational plan, car movement system, and yard assignments have evolved in response to operating sessions and feedback. For example, the spreadsheet-based switch list method allows precise control over car distribution, even if it’s labor-intensive to maintain. Train lineups have also shifted to provide more switching opportunities, responding to an increased interest among operators for local and town jobs over straightforward through trains.
Balancing Prototype Inspiration and Flexibility
The CS&P combines prototype-inspired features with deliberate compromises for fun and flexibility. CTC is used for its clarity and suitability for higher-than-prototype traffic levels, while the layout’s single-track main and hidden staging support a plausible sense of distance. Even features like a wye—originally without a defined use—are reimagined to allow for more interesting prototype-based movements as new ideas emerge.
Creating an Enjoyable Atmosphere and Reducing Stress
A central goal is reducing operational stress, particularly in the yard, by ensuring that crews have the cars they need at session start and not holding up trains due to late arrivals or missed connections. Regular restaging between sessions, a flexible crew lounge environment, and encouragement for operators to focus on enjoyment over perfection all contribute to a welcoming culture. Occasional tweaks—such as customs checks or slow orders—help keep regulars engaged.
Key Takeaways
• CTC signaling and spreadsheet-driven switch lists simplify operations for guest crews. • The operating plan is regularly adjusted based on crew preferences and feedback. • Prototype inspiration guides design choices but is balanced with flexibility for fun. • Yard procedures are structured to minimize stress and support enjoyable sessions. • Ongoing refinements, including small operational twists, help keep the experience engaging for both new and returning operators.
ATLP - Create SEO Metadata
SEO TITLE: Drew James & Canada Spokane and Pacific | HO Scale Operations
META DESCRIPTION: Drew James details HO scale CS&P operations, CTC implementation, car forwarding, yard design, and lessons from the Canada Spokane and Pacific layout.
PRIMARY SEARCH TOPIC: HO scale model railroad operations
SECONDARY SEARCH TOPICS: CTC for model railroads car forwarding systems in operations proto-freelance layout design model railroad yard planning organizing model railroad operating sessions
Central New York Division (NER, spelling/identity confirmation)
National Model Railroad Association (NMRA, confirm organization context as used)
Ops Till You Drop (event details, official name, organizer confirmation)
NER Convention (Concord, confirmation on year/location)
Home Shops (manufacturer/entity for high cube boxcars on Don’s layout — context/URL)
ATLP - Create Buffer Social Pack
POST 1 — EPISODE Drew James of the Canada Spokane and Pacific Railroad joins Around The Layout Podcast for a focused conversation on developing realistic and enjoyable operations. Topics include why the CS&P uses a CTC machine for traffic control, how car forwarding systems evolved from car cards to switch lists, and what it takes to keep regular operators engaged while making operating sessions welcoming for guests. The episode also explores event highlights from the NER convention and the Ops To You Drop gatherings.
[EPISODE LINK]
POST 2 — IDEA How much control should a layout owner keep over car movements? Drew James explains why he prefers manually managed switch lists over automated car card systems: it gives him more say in traffic flow, keeps operations simpler for guests, and lets him better match car distribution to yard and industry capacity.
[EPISODE LINK]
POST 3 — QUOTE “Well, I have a— I just have a big spreadsheet of every single car that I have in service. So there's about 300 and something cars, 350 cars. And every car, I have a 6-day op session, 6-day sequence, if you will. And this big spreadsheet tells me where every car goes Every, for those 6 cycles. And then the 6th cycle, the car ends up back again where it needed to be for the first cycle. So, and then I print out my switch list from that huge spreadsheet.” — Drew James, 00:26:34
Drew James describes the custom spreadsheet-driven car forwarding system he uses on the CS&P, emphasizing the balance between hands-on control and operating variety.
[EPISODE LINK]
POST 4 — EVERGREEN The conversation looks at how thoughtful layout design can reduce operator stress and make sessions more enjoyable. Drew James shares methods for leaving margin in yard operations, assigning jobs based on operator interest, and using layout geometry—like single-track runs and strategic visibility blocks—to create the feeling of distance and travel on a freelanced mainline railroad.
[EPISODE LINK]
ATLP Extra Feature
HEADLINE: Operations Shaped by Operator Experience
BODY: Drew James returned to Around The Layout Podcast to focus on operations planning and refinements on his Canada Spokane and Pacific (CS&P), a proto-freelanced HO layout set in 1978. The episode took a detailed look at how Drew’s operating scheme evolved through hands-on feedback, emphasizing the value of running trains before scenery is complete and making design adjustments based on crew experience. The conversation covered the decision to use CTC over timetable and train order for easier guest operations, Drew’s process for managing car movements with custom switch lists, and the balance between realism and operator enjoyment. The episode also touched on unique features like a seldom-used wye and jobs designed to avoid frustration, with ongoing tweaks to keep sessions fresh for both regulars and newcomers. This retrospective discussion highlighted operator-centered design as a key theme.
ATLP - Clip Candidates
CLIP 1
Start: 00:10:54 End: 00:11:54 Duration: 60 seconds Speaker: Drew James Hook: Why you should start operating your layout before adding scenery Why it works: Drew clearly advocates for early operations to identify and fix track or design issues before committing to scenery, providing practical advice for layout builders. Opening words: "You know, one of the pieces of advice I always give to my friends as they're starting to build new layouts is I think it's important to— if you plan to operate, I think it's important to start operating earlier rather than later, in particular before you're totally covered in scenery." Closing words: "And it was a lot easier to make those changes when I wasn't ripping up scenery and plaster and ballast and all that." Suggested text overlay: Operate Before Scenery Context needed: No
CLIP 2
Start: 00:17:02 End: 00:18:49 Duration: 107 seconds Speaker: Drew James Hook: Why CTC works best for model railroad operations with lots of guest operators Why it works: Drew explains his choice of centralized traffic control for his layout, highlighting its simplicity for guests and its suitability for higher-than-prototype traffic density. Opening words: "One is It's easy for guests to understand. So I knew that on the CSMP, I would be hosting, I hope to host, and it's worked out that way, a lot of guests coming in from out of town to participate in op sessions." Closing words: "When I've run using track warrants, for example, I was spending so much time doing paperwork, I couldn't get the train over the road, if you will. So I kind of settled on CTC as being what made the most sense. And then as I mentioned in the last episode, I saw some CTC machines. Kevin Udally has an amazing one on his C&O layout." Suggested text overlay: Why I Chose CTC for My Layout Context needed: No
CLIP 3
Start: 00:24:00 End: 00:25:52 Duration: 112 seconds Speaker: Drew James Hook: Comparing car cards/waybills versus switch lists for car forwarding Why it works: Drew gives a detailed and candid explanation of why he moved from traditional car cards and waybills to switch lists, focusing on operator expectations and his own process. Opening words: "Another area that I learned a lot from my old layout was in the car forwarding area. So we use switch lists on the CS&P, but that, although I guess it's always been the case on this version of the CS&P, on my previous version, I actually started out with car cards and waybills." Closing words: "They just wanna know what am I supposed to do with this car?" Suggested text overlay: Switch Lists vs Car Cards Context needed: No
CLIP 4
Start: 00:35:00 End: 00:36:32 Duration: 92 seconds Speaker: Drew James Hook: Designing yards and operations for guest comfort rather than stress Why it works: Drew outlines specific design choices he made to keep yard jobs enjoyable and reduce overwhelm during op sessions. Opening words: "So I really wanted the yard job to not be a stressful job for guests. I wanted guests to be able to come in and run the yard without being— and really have enjoyed the session and not felt like were just overwhelmed." Closing words: "and it can be very stressful instead of the fun job that you're trying to make it." Suggested text overlay: Making Yard Jobs Less Stressful Context needed: No
CLIP 5
Start: 00:42:01 End: 00:44:20 Duration: 139 seconds Speaker: Drew James Hook: Finding a use for a track wye by modeling a real railroad scenario Why it works: Drew humorously describes installing a wye “just because,” then later discovering, via a podcast, a real-world use case and how he plans to surprise operators with it. Opening words: "Yes. So there is a wye on my layout. Why there's a wye, I do not know." Closing words: "I have a feeling that the operator of the Nelson switch job will think that's great and won't have a problem with it." Suggested text overlay: Adding Realism With the Wye Track Context needed: No
CLIP 6
Start: 00:55:39 End: 00:56:12 Duration: 33 seconds Speaker: Ray Arnott Hook: How room and sightline design make a layout feel larger Why it works: Ray concisely explains how strategic layout room design enhances the sense of scale, a practical takeaway for other layout builders. Opening words: "And I think we missed, you know, one of the things that's great about— another thing that's great about your layout is the room that it's in. You have the way it's set up. You can't see the entire layout from one spot, right?" Closing words: "You only see really the areas that you're working in, which is really a cool effect." Suggested text overlay: Designing a Layout Room for Immersion Context needed: No
CLIP 7
Start: 00:58:31 End: 00:59:33 Duration: 62 seconds Speaker: Drew James Hook: The challenges of giving regular operators variety, especially for dispatching Why it works: Drew discusses how roster size impacts the ability to keep dispatchers practiced, raising a realistic challenge for hosting complex operations. Opening words: "The only, the only real issue I have is, is dispatching, to be honest. It takes a little bit to get up to speed to become a dispatcher." Closing words: "there's going to get to be a limit of the number of dispatchers I can really have." Suggested text overlay: Keeping Dispatchers Sharp Context needed: No
ATLP - YouTube Titles
Staging for Success: Smoother Operations Without Car Card Stress
Revamping Yard Operations for Relaxed and Fun Sessions
Designing Model Railroad Layouts With Guest Operators in Mind
Switch Lists or Car Cards: Picking the Right System for Your Crew
Making Mainline Runs Feel Huge on Basement-Sized Layouts
Adding Variety: Simple Tweaks That Refresh Regular Op Sessions
Proto-Freelance Operations: Blending Realism and Flexibility
Balancing Prototype Traffic with Model Railroad Reality
CTC Machines and Fast Clocks: Streamlining Busy Layouts
From Concept to Crew: Evolving Operations on a Proto-Freelance Layout
ATLP - Create YouTube Description
Drew James joins Around The Layout Podcast to discuss operations on the Canada Spokane and Pacific Railroad, his proto-freelance HO scale layout set in June 1978 and stretching between Calgary and Spokane. The conversation highlights Drew’s approach to designing for enjoyable, flexible operations, including crew management, yard jobs, train scheduling, and the balance between prototype practices and practical model railroad considerations.
The episode covers tradeoffs between car cards, waybills, and switch lists; the role of computer tools and custom spreadsheets for car forwarding; and why layout design choices like single-track mainlines, a dispatcher’s CTC machine, and staging flexibility matter for group operating sessions. Drew, joined by guests who have operated on the CS&P, examines methods for keeping regular operators engaged, approaches to evolving a layout over time, and the importance of fostering a social, low-stress atmosphere for both newcomers and experienced modelers.
IN THIS EPISODE: • Designing a proto-freelance railroad with operations in mind • Balancing car forwarding systems: car cards, waybills, and switch lists • Implementing a CTC machine and managing dispatcher roles • Setting up enjoyable yard jobs and reducing operational stress • Adjusting train schedules and layout features to support different operator preferences • Evolving the layout’s operations to keep sessions fresh and engaging
ABOUT AROUND THE LAYOUT PODCAST: Around The Layout Podcast gives model railroaders a platform to share their stories, ideas, and experiences while helping educate, inspire, and connect the hobby.
SEARCH THE ATLP ARCHIVE FOR: NER conventions regional events
SUGGESTED ANCHOR TEXT: NER conventions and regional model railroad events
WHY IT IS RELEVANT: A significant part of the episode discusses recent and past NER conventions, participation, and the value of regional events for operations and learning.
TOPIC: Ops Till You Drop Event (Central New York)
SEARCH THE ATLP ARCHIVE FOR: Ops Till You Drop event Central New York
SUGGESTED ANCHOR TEXT: Ops Till You Drop event
WHY IT IS RELEVANT: The Ops Till You Drop event is repeatedly highlighted as a key operating weekend, with discussion of its organization, participating layouts, and importance to the local operating community.
TOPIC: Car Forwarding Systems (Switch Lists vs. Car Cards)
SEARCH THE ATLP ARCHIVE FOR: car forwarding systems switch lists car cards
SUGGESTED ANCHOR TEXT: switch lists versus car cards for car forwarding
WHY IT IS RELEVANT: The episode explores in depth the pros and cons of different car forwarding methods, revealing lessons learned and practical tips for choosing between switch lists and car cards.
TOPIC: CTC Panel Implementation and Model Railroad Dispatching
SEARCH THE ATLP ARCHIVE FOR: model railroad CTC panels dispatching
SUGGESTED ANCHOR TEXT: model railroad CTC panels and dispatching
WHY IT IS RELEVANT: A central part of the conversation details the design, use, and operator experience of a working CTC panel for operations, including training, complexity, and practical challenges.
TOPIC: Canada Spokane and Pacific (CS&P) Layout Operations
SEARCH THE ATLP ARCHIVE FOR: Canada Spokane and Pacific layout operations
SUGGESTED ANCHOR TEXT: Canada Spokane and Pacific operations
WHY IT IS RELEVANT: The episode centers on the operations, design philosophy, and evolution of Drew James’ CS&P layout, making this a recurring and substantial ATLP topic.